In the area you have selected (Solomon Islands) cyclone (also known as hurricane or typhoon) hazard is classified as high according to the information that is currently available. This means that there is more than a 20% chance of potentially-damaging wind speeds in your project area in the next 10 years. Based on this information, the impact of cyclones must be considered in all phases of the project, in particular during design and construction. Project planning decisions, project design, and construction methods should take into account the level of cyclone hazard. Note that damages can not only occur due to wind but also cyclone induced heavy rainfall and subsequent flooding as well as coastal floods in coastal areas. Further detailed information should be obtained to adequately account for the level of hazard.

Climate change impact: Global average tropical cyclone wind speed and rainfall is likely to increase in the future, and the global average frequency of tropical cyclones is likely to decrease or remain unchanged. It is possible that the frequency of the most intense tropical cyclones will increase substantially in some ocean regions (IPCC, 2013). The present hazard level in areas currently affected by tropical cyclones may increase in the long-term. Projects located in such areas should be robust to future increases in cyclone hazard.

Recommendations

  • INSURANCE: For cyclone wind risks that cannot be mitigated, consider insurance products specifically aimed at alleviating the financial costs associated with wind risk. More information
  • INTERACTING HAZARDS: Project planning, design, and construction practices should account for strong wind from potential cyclones in your project area. More information
  • EMERGENCY RESPONSE PLANS: Identify the regional and national government’s emergency response policy and protocols to cyclones (including coastal and inland flooding and wind hazard) in your project area and incorporate as necessary. More information
  • CRITICAL INFRASTRUCTURE: If the project involves the development of critical infrastructure (e.g., a hospital, fire station, or power transmission line), or will support critical infrastructure, you should consider how your project can be affected by wind that occurs outside of the specific project location. More information
  • TECHNICAL EXPERTISE: Consult with an expert familiar with cyclone wind hazard and risk-related construction practices in your local area. Such consulting professionals include structural engineers, civil engineers, and atmospheric scientists. Incorporate local and subject matter expertise in the design, construction, and maintenance phases of your project. More information
High Low
Medium Very low

Further resources

For further information the following resources could be consulted:

We welcome any suggestions for improvements to the tool, including suggestions of data, recommendations, or resources to include.

If you have any, please provide feedback.