Nepal

In the area you have selected (Nepal) cyclone (also known as hurricane or typhoon) hazard is classified as low according to the information that is currently available. This means that there is a 1% chance of potentially-damaging wind speeds in your project area in the next 10 years. Based on this information, the impact of cyclones should be considered in the project, in particular during design and construction. Project planning decisions, project design, and construction methods should take into account the level of cyclone hazards. Note that damages can not only occur due to wind but also cyclone induced heavy rainfall and subsequent flooding as well as coastal floods in coastal areas. Further detailed information should be obtained to adequately account for the level of hazard.

Recommendations

  • INSURANCE: For cyclone wind risks that cannot be mitigated, consider insurance products specifically aimed at alleviating the financial costs associated with wind risk. More information
  • INTERACTING HAZARDS: Project planning, design, and construction practices should account for strong wind from potential cyclones in your project area. More information
  • EMERGENCY RESPONSE PLANS: Identify the regional and national government’s emergency response policy and protocols to cyclones (including coastal and inland flooding and wind hazard) in your project area and incorporate as necessary. More information
  • CRITICAL INFRASTRUCTURE: If the project involves the development of critical infrastructure (e.g., a hospital, fire station, or power transmission line), or will support critical infrastructure, you should consider how your project can be affected by wind that occurs outside of the specific project location. More information
  • TECHNICAL EXPERTISE: Consult with an expert familiar with cyclone wind hazard and risk-related construction practices in your local area. Such consulting professionals include structural engineers, civil engineers, and atmospheric scientists. Incorporate local and subject matter expertise in the design, construction, and maintenance phases of your project. More information
High Low
Medium Very low
We welcome any suggestions for improvements to the tool, including suggestions of data, recommendations, or resources to include.

If you have any, please provide feedback.